📄
Preparing PDF, please wait...

Visual Quick Workflow

Select a heading to see exactly what needs to be done at that step.

1. Workspace Enter diameter, stock length and project zone; upload Excel/CSV or add manual rows.

👤 1. Account, Login and Team Invitation

  • Registration and login: Register from the homepage with your name, email and password. Enter the 6-digit verification code sent by email to access the workspace.
  • Team connection: Company code cannot be changed manually for security reasons. Add teammates from the Team Management screen; invited users activate their account with the invitation code and join the company pool.

📊 2. Starting a New Analysis

  • Project information: In the workspace, select rebar diameter, main stock length and optionally enter the zone/project name.
  • Adding the cutting list:
    - Excel/CSV: Upload .xlsx, .xls, .csv or .txt files with Length in column A, Quantity in column B and Position in column C.
    - Manual entry: Add position, length and quantity line by line.
    - Virtual stock: Select usable pieces from the company shared stock and include them in the analysis.
  • Once all data is ready, click the "Start Analysis" button.

⚙️ 3. Critical Parts and Optimization Result

  • Critical part check: CutRB separates pieces that cannot be cut efficiently from standard stock or require custom ordering.
  • Custom length selection: Choose special order lengths where needed. This directly affects final waste and total savings.
  • Result comparison: Review initial waste, final waste, net engineering tonnage and savings before confirming the analysis.

🏷️ 4. Detailed Report, Labels and QR Tracking

  • Detailed report: Each bar shows cut pieces, remaining waste, custom orders and virtual stock usage.
  • QR and single labels: The top Print Labels button creates the full label set. If a field worker loses a paper label, use the Single Label link on the right side of the Summary Cutting Plan row to reprint only that row. When a QR code is scanned, the related cutting row is marked as completed.
  • Excel/PDF/CNC outputs: Use the top buttons to create management reports, Excel files or machine/CNC compatible CSV outputs.

🏢 5. Archive, Virtual Stock and Team Performance

  • Virtual Stock: Store reusable leftover pieces in the company shared pool and use them in future analyses.
  • Analysis Archive: View past analyses. Deleting from archive only hides the record from the archive screen; it does not remove tonnage, waste or savings from team performance reports.
  • Team Management and Balance: Send invitations, monitor user limits, review team tonnage, initial/final waste and savings by date range. Manage package and credit status from the balance screen.

✅ 6. Recommended Daily Workflow

  • Check virtual stock first, then enter diameter, stock length and zone/project information in the workspace.
  • Upload your Excel/CSV file or enter manual rows; select virtual stock pieces if needed.
  • Confirm the analysis, print all QR labels or a row-level single label, track cutting status on site and keep the report in the archive.